Zhenjiang Gaozi Reservoir Pumping Station Project

2006.06-07

The construction of the Zhenjiang Gaozi Reservoir Pumping Station Project aims to accelerate the development of the Dantu Economic Development Zone, expand the scale of the new district, and meet the water supply needs of building a modern port city.
Covering an area of about 42 acres, the design elevation of the station area is 15.5-21m. The total design scale of the booster station is 100,000 m3/d, and the scale of the first phase is 30,000 m3/d.
The pumping station has a clear water tank, booster pump room, chlorination room, power distribution room, office building, doorman and other ancillary facilities with a total construction area of 1,830 square meters.